Progress 01-JAN-2012
In progress:
- V-Berth
- Rewire anchor winch (03-DEC-2011)
- Fit and wire new front navigation lights (18-DEC-2011)
- Fit and wire new cabin lights
- Fit and wire red floor lights
- Fit and wire fan
- V-Berth Wiring
- Re-line walls
- Fit new head-liner
- Service / clean / paint anchor winch
- Service port lights
- Overhaul fuel system
- Expose fuel tank fittings (03-NOV-2011)
- Fix any fuel leaks
- Replace perished hoses
- Make and fit fuel treatment plant (27-DEC-2011)
- Renovate bilge pump system
- Replace main cabin head liner and fix any ceiling leaks
- Remove old head liner (03-NOV-2011)
- Re-bed hand rail (11-DEC-2011)
- Re-bed dorade boxes and traveler
- Secure boom off traveler
- Remove and re-bed traveler assembly
- Build navigation light control / monitor panel
- Replace galley sink tap
- Renovate galley worktop surfaces
- Resurface navigation table top
- Renovate portlights and hatches
Done:
- Fit anti-chafe hose to mooring line (03-NOV-2011)
- Refit mangled rubbing strip (03-NOV-2011)
TBD (or may never be done!):
- Renovate head
- Re-plumb toilet
- Re-plumb shower
- Renovate under-sink pipework and identify through-hull problems
- Renovate sink
- Investigate functioning of holding-tank system
- Renovate main cabin accommodation
- Renovate galley
- Rewire rest of boat
- Renovate mast and rigging
- Hot water system
- Re-bed / replace through-hulls
- Add down-control to anchor winch
- Add remote control to anchor winch
- Boarding Ladder
- Attach wooden rungs
- Fit extension piece
Maintenance Schedule Plan - each item here needs a maintenance plan and a spares kit.